Send Your BOQ / Get a Quote

Architectural Openings

Architectural Opening Systems for Building Projects

Coordinate aluminum windows and doors, interior and entrance doors, glazing, hardware, finishes and opening schedules around the project drawings, performance requirements and approval process.

Opening schedules
Drawings and interface details
Finish and hardware selection
Product-specific documentation
Slim-frame aluminum window and sliding door systems on a villa facade

System Families

Start With the Required Opening Type

Each category follows a different selection, drawing and documentation path. Review the relevant family before confirming sizes, configurations, finishes and hardware.

Aluminum windows and sliding doors for a residential building project

Windows, Doors and Glazing

Aluminum Windows & Doors

Review opening styles, frame systems, glass build-ups, finish options, hardware and project-specific performance requirements.

Explore Aluminum Systems →
Timber entrance door and flush interior door applications

Interior and Entrance Doors

Wooden & Metal Doors

Coordinate door leaves, frames, finishes, hardware sets, opening directions and any documentation required for the selected application.

Explore Door Systems →

Selection Inputs

Define the Information Before Comparing Systems

A useful quotation depends on the opening schedule, drawings, location and required configuration—not on a product image alone.

01

Opening Type & Operation

Identify fixed, hinged, sliding, folding, pivot or other required opening functions.

02

Dimensions & Interface

Confirm opening sizes, wall build-ups, sill conditions, fixing zones and adjacent finishes.

03

Environment & Requirements

Provide the project location and any stated structural, thermal, acoustic, water or fire criteria.

04

Finish, Glass & Hardware

Record finish references, glass preferences, hardware functions, access needs and approval samples.

Opening Schedule Workflow

Keep Every Opening Connected to One Reference

Use a consistent opening reference across quotations, drawings, samples, production information, labels and packing records.

01

Reference & Location

Assign the room, elevation and opening mark shown on the project drawings.

02

Size & Operation

Record structural opening size, frame size, handing and operating configuration.

03

System Construction

Identify frame, leaf, glass or door construction proposed for the application.

04

Hardware & Accessories

Coordinate locks, handles, closers, seals, screens and access-control interfaces where required.

05

Finish & Sample Status

Track selected colors, veneers, coatings, glass appearance and sample approvals.

06

Revision & Approval

Keep revision comments and approval status visible before information is released.

Approval Information

Match Documentation to the Selected Product

A certificate or test report should only be used when its holder, product, model, configuration, standard and validity match the proposed system.

  • Opening schedules and coordinated drawings
  • Product datasheets and proposed configurations
  • Applicable test or certification documents, when available
  • Finish, glass and hardware sample references
  • Approval comments, revisions and release status
Aluminum window fabrication and inspection reference

Quality & Delivery Records

Check the Approved Scope Before Packing

The inspection checklist should follow the approved product, configuration and project scope. Packing references should remain connected to the opening schedule.

  • Frame, leaf, glass and visible-finish checks
  • Hardware operation, seals and accessory review
  • Opening-reference labels and package identification
  • Protection selected for product size and shipping route
  • Quantity, package and loading records

Architectural Openings FAQ

Questions to Resolve Before Quotation

Requirements differ by system, configuration and project location. Confirm the exact documentation applicable to the selected product.

Do all window and door systems meet the same standards?
No. Standards and test results apply to defined products, models, sizes and configurations. Provide the project requirements so the relevant documents can be checked against the proposed system.
What information is needed for a quotation?
Send the opening schedule, plans or elevations, project location, sizes, opening functions, finish preferences, glass or door requirements and any stated performance criteria. Missing items can then be listed for clarification.
Can window and door sizes be customized?
Project-specific sizes may be reviewed, but feasibility depends on the selected system, configuration, hardware, glass or door construction, transport limits and installation interface.
How should thermal or acoustic performance be confirmed?
Use documentation that identifies the tested product and configuration. Frame, glass, dimensions, seals and installation conditions can affect the result, so a value should not be applied to a different assembly without confirmation.
Can fire-rated door options be reviewed?
Yes, when the required application and rating are provided. The proposed door leaf, frame, hardware, seals and supporting report must be checked as one applicable assembly before any compliance wording is used.
How are finishes and hardware coordinated?
Record finish references and hardware functions in the schedule, then connect samples, comments and revisions to the same opening reference before release.
How are windows and doors prepared for shipping?
Packing should be selected according to product type, size, finish, handling method and route. Package labels and quantity records should correspond with the approved opening schedule.
What warranty applies to the selected system?
Warranty terms vary by supplier, product, finish, glass and hardware. Request the exact written warranty applicable to the quoted configuration and project conditions before order approval.

Start the Review

Send Your Window, Door or Opening Schedule

Share plans, elevations, opening references, product preferences and any stated performance requirements. The available information can be reviewed before the next quotation step.