Send Your BOQ / Get a Quote

External Entrance Systems

Metal Entrance Doors for Residential & Commercial Projects

Coordinate hinged, pivot, armored and decorative metal entrance doors around the opening, frame, threshold, exposure, hardware, finish and project-specific documentation.

Opening and frame dimensions
Hinge or pivot configuration
Lock and access-control preparation
Finish and exposure requirements
Metal entrance door system for a residential or commercial project

System Families

Select the Entrance Type by Opening and Project Brief

The proposed system should reflect the opening size, operation, exposure, access requirements, aesthetic direction and supporting documentation.

Modern metal pivot entrance door with bottom pivot hardware Pivot Systems

Architectural Pivot Doors

Coordinate panel size, pivot position, structure, clearances, threshold and operating hardware.
Metal entrance door with reinforced lock preparation Security Systems

Armored Entrance Doors

Review frame, internal reinforcement, lock preparation and verified security requirements by model.
Decorative wrought iron entrance door with glazed panels Decorative Systems

Wrought Iron & Glazed Doors

Coordinate decorative metalwork, glass, opening panels, finish and surrounding architecture.

Schedule Inputs

Define the Entrance Before Selecting the System

Record the geometry, operation, exposure and interface responsibilities for every entrance mark.

01

Opening Geometry

Width, height, wall build-up, head and jamb conditions.

02

Operation

Hinged, pivot, pair, fixed side panel or transom arrangement.

03

Exposure

Covered or exposed location, climate and drainage conditions.

04

Access Brief

Mechanical lock, smart-lock preparation or access-control interface.

Metal entrance door section showing frame, lock and pivot interfaces

Structural Coordination

Resolve the Frame, Pivot and Threshold Conditions

Large or heavy entrance systems require project-specific structural review. Published dimensions and capacities should not be generalized across models.

  • Structural opening and fixing substrate
  • Frame depth, jamb detail and façade interface
  • Hinge or pivot position and service access
  • Finished floor level and threshold recess
  • Drainage and weather-seal interfaces
  • Required movement and installation clearances

Hardware Coordination

Coordinate Locks and Access Control Before Fabrication

Hardware compatibility depends on the exact door construction, backset, power supply, wiring, reader position and project access strategy.

Lock Case

Confirm dimensions, backset, strike and reinforcement.

Operating Hardware

Handles, pulls, pivots, hinges, closers and stops.

Smart-Lock Preparation

Coordinate compatible pockets, wiring routes and power requirements.

Access Interfaces

Review readers, contacts and project-side control responsibilities.

Finish Selection

Match the Finish System to Location and Exposure

Material, preparation and coating options should be reviewed for the selected substrate, color, texture, maintenance plan and site conditions.

  • Steel, aluminum, iron or combined construction
  • Paint, powder-coated, plated or decorative finish direction
  • External exposure and coastal requirements
  • Color, texture, sheen and control sample
  • Visible edges, welds and hardware finish
  • Care and maintenance information when available
Wrought iron entrance door finish and decorative metalwork reference

Approval Information

Verify Performance Against the Exact Door Assembly

Security, wind, water, thermal, fire or corrosion claims should only be used when the tested model and conditions match the proposed entrance.

System Drawings

Frame, leaf, reinforcement, threshold, hardware and fixing details.

Product Documents

Datasheets, installation information, finish references and maintenance notes.

Applicable Evidence

Reports and certificates matched to holder, model, size, construction and validity.

Project Workflow

From Entrance Brief to Coordinated Shipment

Keep the system, opening, hardware and finish decisions connected to one approved revision.

01

Review

Organize openings, types and missing information.

02

Select

Compare suitable systems and finish directions.

03

Coordinate

Resolve frames, thresholds, hardware and interfaces.

04

Approve

Track drawings, samples and documents.

05

Produce

Follow the released configuration.

06

Inspect

Check references, labels and protective packing.

Metal entrance door fabrication and finish preparation stages

Pre-Shipment Review

Check the Approved Configuration Before Packing

  • Opening mark, system, quantity and handing
  • Frame, leaf, threshold and visible finish
  • Accessible locks, pivots, hinges and accessories
  • Basic operation appropriate to the assembled product
  • Protective packaging, labels and loose-item references

Frequently Asked Questions

Metal Entrance Door Coordination

Final suitability depends on the opening, selected system, site exposure and verified project requirements.

What information is needed for a metal entrance door quotation?
Provide plans, opening dimensions, wall and floor details, operation, quantity, finish direction, hardware or access-control brief, project location and delivery information.
What entrance door types can be reviewed?
The scope may include hinged, pivot, armored and decorative wrought iron or glazed entrance configurations, subject to the selected supplier and project requirements.
How is a pivot door coordinated?
The panel, pivot position, frame, supporting structure, floor recess, clearances and hardware must be reviewed as one system.
Can smart locks or access control be prepared?
Compatible preparation can be reviewed when the exact hardware, dimensions, wiring, power and project-side interfaces are confirmed before fabrication.
How should exterior finishes be selected?
Review substrate, preparation, finish system, color, texture, exposure and maintenance requirements. Do not assume one coating suits every climate.
Do all metal entrance doors have the same security or weather rating?
No. Ratings apply only to the tested or certified assembly and its specified size, frame, hardware, seals, glazing and installation conditions.
What is checked before shipment?
Checks may cover marks, dimensions, handing, visible condition, finish, accessible hardware, suitable basic operation, labels and packing.
How are large entrance doors packed?
The method depends on dimensions, weight, finish and route. Protective surfaces, edges, frames, hardware and labels should be coordinated with the shipment plan.

Start the Review

Send Your Entrance Opening and Door References

Share plans, opening dimensions, preferred operation, frame and threshold conditions, finish direction, hardware requirements and project location.

Submit Project Details