Architectural Openings
Wooden & Metal Door Systems for Building Projects
Coordinate interior wooden doors and metal entrance doors around the opening schedule, drawings, frame conditions, finishes, hardware, documentation and delivery sequence.
Door Families
Choose the Door Family by Location and Use
Interior and entrance doors follow different structural, finish, hardware and documentation paths. Start with the family assigned in the project schedule.
Wooden Door Systems
Flush, solid-core, concealed and project-specific interior doors coordinated with frames, finishes and hardware.Explore Wooden Doors →
Metal Entrance Doors
Hinged, pivot, armored and decorative metal entrances reviewed against the opening, exposure and hardware brief.Explore Metal Entrance Doors →Schedule Inputs
Organize Every Door by Mark, Location and Opening
A coordinated schedule helps prevent model, handing, frame, finish and hardware information from separating during quotation and production.
Door Mark & Location
Record floor, room, opening reference and quantity.
Opening Size
Distinguish structural opening, frame size and leaf size.
Handing & Operation
Confirm swing, pivot, pair, sliding or concealed operation.
Approval Status
Track drawings, samples, hardware and released revisions.
Application Planning
Match Door Construction to the Opening Responsibility
Room function, traffic, weather exposure, access control and applicable code requirements should guide the proposed construction.
Interior Rooms
Coordinate leaf construction, frame, finish, privacy hardware and adjacent wall details.
Public & Service Areas
Review traffic, operational hardware, durability brief and applicable life-safety requirements.
External Entrances
Review weather exposure, threshold, drainage, sealing, security and façade interfaces.
Interface Review
Resolve Frame, Wall and Threshold Conditions Before Release
The selected system should be checked against the actual construction build-up and installation responsibility.
- Structural opening and finished wall thickness
- Frame profile, architrave, shadow gap or flush detail
- Floor finish, threshold and clearance
- Adjacent paneling, stone, glazing or façade interfaces
- Fixing substrate and access for installation
- Required movement and service clearances
Selection Coordination
Keep Finishes and Hardware Linked to Each Door Mark
Door appearance and operation depend on a complete combination of leaf, frame, edge, hardware and adjacent-finish references.
Leaf Finish
Veneer, paint, laminate, metal finish or approved reference.
Frame Finish
Coordinate frame material, visible edges and surrounding wall finish.
Operating Hardware
Hinges, pivots, closers, handles, locks and door-control items.
Accessories
Stops, seals, viewers, kickplates and project-specific accessories.
Approval Information
Match Performance Documents to the Selected Door Set
A rating or certificate should only be used when the holder, model, construction, size, frame, hardware, standard and validity match the proposed assembly.
- Door and frame drawings
- Product datasheets and hardware schedules
- Finish samples and control references
- Applicable fire, acoustic, security or weather documents
- Installation information and interface details
- Approval comments, revisions and release status
Project Workflow
From Door Schedule to Coordinated Shipment
Each stage should remain connected to the approved door marks and current project information.
Review Schedule
Organize marks, quantities, types and missing inputs.
Prepare Options
Compare suitable constructions, finishes and hardware scope.
Coordinate Drawings
Confirm openings, frames, handing and interfaces.
Track Approvals
Record samples, documents, comments and revisions.
Follow Production
Monitor approved door sets and category status.
Inspect & Pack
Check agreed references, labels and protection.
Pre-Shipment Review
Inspect and Label by Door Mark
Inspection and packing should follow the agreed door schedule, selected finish and hardware scope.
Identity Check
Door mark, quantity, handing and room reference.
Visible Condition
Leaf, frame, finish, edges and accessible hardware.
Operation Check
Basic opening, closing and hardware checks as applicable.
Protective Packing
Edge protection, wrapping, labels and accessory identification.
Frequently Asked Questions
Wooden and Metal Door Coordination
Final suitability depends on the selected door set, opening, project location and applicable documents.
What information is needed for a door quotation?
Should wooden and metal doors use one schedule?
How are opening dimensions confirmed?
Can hardware be included?
Can door finishes match wall panels or cabinetry?
Do all doors carry the same fire, acoustic or security ratings?
What is checked before shipment?
How are doors packed for delivery?
Start the Review
Send Your Door Schedule and Opening Drawings
Share door marks, quantities, opening dimensions, preferred types, finish references, hardware requirements and project location. The available information can be reviewed before the next quotation step.